0
Skip to Content
BKT Global
Business
Tomorrow Water Project
Co-Flow Campus
Technologies
Proteus
AMX
Draco
AAD
vDAF
Reference
About Us
Contact
corp.
BKT Global
Business
Tomorrow Water Project
Co-Flow Campus
Technologies
Proteus
AMX
Draco
AAD
vDAF
Reference
About Us
Contact
corp.
Folder: Business
Back
Tomorrow Water Project
Co-Flow Campus
Folder: Technologies
Back
Proteus
AMX
Draco
AAD
vDAF
Reference
About Us
Contact
corp.
Seogwipo City West Livestock Wastewater Treatment Plant
Main References 21 bkt 2/14/24 Main References 21 bkt 2/14/24

Seogwipo City West Livestock Wastewater Treatment Plant

  • 200㎥/d

  • Proteus NDN

  • Livestock wastewater treatmen, O&M

Read More
Hongcheon Green Energy Town
Main References 21 bkt 2/7/24 Main References 21 bkt 2/7/24

Hongcheon Green Energy Town

Facility capacity: Total 100 tons/day (livestock manure 80 tons/day, food waste 20 tons/day)

Read More
Buan Gyukpo STP 
Proteus Ref. 21 bkt 1/1/24 Proteus Ref. 21 bkt 1/1/24

Buan Gyukpo STP 

Buan Gyukpo STP  3,300m3/d

Read More
Taean Byungsulman STP
Proteus Ref. 21 bkt 1/1/24 Proteus Ref. 21 bkt 1/1/24

Taean Byungsulman STP

Taean Byungsulman STP  1,700m3/d

Read More

HQ. 25, Yuseong-daero 1184beon-gil, Yuseong-gu, Daejeon, Republic of Korea

T. 070.5050.5527 I F. 070.5050.5566 I W. bkt@bkt21.co.kr

Copyright © 2019 BKT. All Rights Reserved.