Daejeon Sewage Treatment Plant Modernization Project (under construction)
- Facility capacity: Total 727 tons/day (sewage sludge 727 tons/day) 
- Methane production rate: 0.25 Nm³ CH₄/kgVS (design) 
- Organic matter removal rate: 55.0% (design) 
- Draco, AAD, AMX 
Bukyung Slaughterhouse Waste Treatment Center
- Facility capacity: Total 100 ㎥/d(Municipal sludge 50 tons/day, slaughterhouse waste 50 tons/day) 
- Input water content: 80.0% 
- Sludge volume reduction: 70% 
 
                         
