0
Skip to Content
BKT Global
Business
Tomorrow Water Project
Co-Flow Campus
Technologies
Proteus
AMX
Draco
AAD
vDAF
SBR
Reference
Blog
About Us
Contact
corp.
BKT Global
Business
Tomorrow Water Project
Co-Flow Campus
Technologies
Proteus
AMX
Draco
AAD
vDAF
SBR
Reference
Blog
About Us
Contact
corp.
Folder: Business
Back
Tomorrow Water Project
Co-Flow Campus
Folder: Technologies
Back
Proteus
AMX
Draco
AAD
vDAF
SBR
Reference
Blog
About Us
Contact
corp.
Miryang City Livestock Excrement Public Treatment Facility
Main References 21 bkt 2/7/24 Main References 21 bkt 2/7/24

Miryang City Livestock Excrement Public Treatment Facility

  • Facility capacity: Total 100 ㎥/d (livestock manure 80 ㎥/d, food 20 ㎥/d)

  • Methane production rate: 0.40 Nm³ CH₄/kgVS (design)

  • Organic matter removal rate: 70.0% (design)

Read More
Daegu City Organic waste resources integrated energy facility
Main References 21 bkt 2/7/24 Main References 21 bkt 2/7/24

Daegu City Organic waste resources integrated energy facility

  • Facility capacity: Total 20 ㎥/d (food 18 ㎥/d sewage sludge 2 ㎥/d)

  • Methane production rate: 0.51 Nm³ CH₄/kgVS (130% compared to design)

  • Organic matter removal rate: 86.8%

Read More
Daejeon Sewage Treatment Plant Modernization Project (under design)
Main References 21 bkt 2/7/24 Main References 21 bkt 2/7/24

Daejeon Sewage Treatment Plant Modernization Project (under design)

  • Facility capacity: Total 727 tons/day (sewage sludge 727 tons/day)

  • Methane production rate: 0.25 Nm³ CH₄/kgVS (design)

  • Organic matter removal rate: 55.0% (design)

Read More
Hongcheon Green Energy Town
Main References, BCS References 21 bkt 2/7/24 Main References, BCS References 21 bkt 2/7/24

Hongcheon Green Energy Town

Facility capacity: Total 100 tons/day (livestock manure 80 tons/day, food waste 20 tons/day)

Read More

HQ. 25, Yuseong-daero 1184beon-gil, Yuseong-gu, Daejeon, Republic of Korea

T. 070.5050.5527 I F. 070.5050.5566 I W. bkt@bkt21.co.kr

Copyright © 2019 BKT. All Rights Reserved.