Jungnang Water Resource Recovery Facility
Jungnang Water Resource Recovery Facility
Proteus, Primary, Secondary, Tertiary, Wet Weather Flow, Jungnang
Seonam Water Resource Recovery Facility
Seonam Water Resource Recovery Facility
Primary, Secondary, Tertiary, Municipal
Busan Noksan Sewage Treatment Plant
- 780 t/d(Sludge 578 t/d, Food Wastewater 200 t/d) 
- Influent TN 1,249 mg/L, Nitrogen Removal Rate 84.6% 
- Hydraulic Retention Time(HRT) 2.1d, Nitrogen Loading Rate(NLR) 0.6 kgN/㎥/d 
- AMX 
Daejeon Sewage Treatment Plant Modernization Project (under construction)
- Facility capacity: Total 727 tons/day (sewage sludge 727 tons/day) 
- Methane production rate: 0.25 Nm³ CH₄/kgVS (design) 
- Organic matter removal rate: 55.0% (design) 
- Draco, AAD, AMX 
Daejeon STP(AMX Mass Cultivation Tank)
- 600㎥/d(Sewage sludge digestate) 
- Influent TN 650 mg/L, Nitrogen Removal Rate 82% 
- Hydraulic Retention Time(HRT) 0.4d, Nitrogen Loading Rate(NLR) 1.8 kgN/㎥/d 
- Digestate, side-stream AMX 
Hyperion Water Reclamation Plant, USA
- Sewage Main-stream reference(40㎥/d) 
- main-stream AMX, Mainstream AMX 
Samsung Electronics Industrial Wastewater Treatment
- Industrail wastewater treatment 
- High-load Nitrogen wastewater treatment AMX 
Daewon Agricultural Products Bio-gas Plant Project(Goesan County)
- 280 t/d(Food waste digestate) 
- Influent TN 2,036 mg/L, Nitrogen Removal Rate 84.3% 
- Hydaulic Retention Time(HRT) 3.8d, Nitrogen Load Rate(NLR)0.53 kgN/㎥/d 
- Digestate, side-stream AMX 
Daejeon Sanitary Landfill
- 30t/d(Landfill Leachate) 
- Influent TN 1,515 mg/L, Nitrogen Removal Rate 87% 
- Hydraulic Retention Time(HRT) 2.2일, Nitrogen Loading Rate(NLR) 0.7 kgN/㎥/d 
- Leachate, side-stream AMX 
Muan County Public Food Waste Treatment Plant Expansion Project
- 87 t/d(Food waste digestate) 
- Influent TN 1,557 mg/L, Nitrogen Removal Rate 81.4% 
- Hydraulic Retention Time(HRT) 2.8일, Nitrogen Loading Rate(NLR) 0.6 kgN/㎥/d 
- Digestate, side-stream AMX 
GS Caltex Yeosu City Wastewater Treatment Plant No.2 New Thickening Process Project
- Industrial Wastewater 
- Capacity: 600㎥/d 
- Process: vDAF 
Dangjin City Livestock Wastewater Treatment Plant Advanced Treatment Facility Project
- 7.0㎥/hr 
- vDAF 
- Wastewater Advanced Treatment(Tertiary) 
Boeun County Livestock Wastewater Treatment Plant Advanced Treatment Facility Project
- 5.0㎥/hr 
- vDAF 
- Wastewater Advanced Treatment(Tertiary) 
Boeun County Livestock Wastewater Treatment Plant Project
- 80㎥/d 
- BCS, FMX, vDAF, Proteus NDN 
- Livestock wastewater treatment, resource recovery, O&M 
 
                         
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
